Appointment of a technical plant manager for a distribution network - application
General information
Distribution network operators must appoint a natural person as plant manager for the technical management and supervision of the distribution network before starting the operation of a network (Art. 35 (1) Vienna Electricity Act 2005). The appointment must be approved by the authorities (Art. 35 Vienna Electricity Act 2005).
Requirements
The plant manager must
- be of full legal age and capacity and have a minimum age of 24
- be an Austrian citizen or have an equivalent status due to EU law or an interstate treaty
- be domiciled in Austria or in another country whose nationals are treated equally to Austrians due to EU law or an interstate treaty
- be professionally suited to manage and supervise the operations of a distribution network
- be responsible and have the necessary capacity to act.
A plant manager may not have been excluded from exercising the concession. Grounds for exclusion are conviction for certain crimes and filing for bankruptcy or composition (Art. 54 (4) Vienna Electricity Act 2005).
Deadlines
None
Contact
Office of the Vienna Provincial Government
Construction, Energy, Railway and Aviation Law (MA 64)
Energy Group
1080 Vienna, Lerchenfelder Straße 4
Phone: +43 1 4000-89919
Fax: +43 1 4000-99-89910
E-mail: post@ma64.wien.gv.at
Office hours: Monday to Thursday 8 am to 3:30 pm, Friday 8 am to 1 pm
Good Friday, 24. and 31. December 8 am to 12 noon; closed on public holidays.
You have the option to submit your requests online, by email, or by post.
For telephone inquiries, we are available during office hours.
Personal appointments (customer service) are possible by prior arrangement during office hours.
Authentication and signature
Authentication or signature of the application is not required.
Documents required
- Documentation showing the appointment as technical plant manager
- Agreement of the technical plant manager(s) with their appointment
- Details about their position in the company as proof of the necessary authority
- Certificate of citizenship
- Residence registration certificate
- Police clearance certificate (German)
- Documents proving their suitability as electrical engineer or description of education, training and previous occupations
Type and format of the evidence to be submitted:
You can find more information about bringing in documents at: Contact the City of Vienna (German)
Fees
The fees are due after the procedure has been concluded and amount to:
- Provincial administrative fee: EUR 6.54
- Duty for the application as per Duty on Documents Act: EUR 14.30
Further costs depend on the number of documents filed with the application.
For any questions regarding payment, please contact the competent accounting department (Buchhaltungsabteilung 40) (German) of Municipal Department 6 - Accounting Services, Duties and Charges.
Form
Online application: Appointment of a technical plant manager for a distribution network (German)
Further information
The approval will be revoked if any of the requirements are no longer met or if there is reason to doubt the reliability of the technical plant manager. If the plant manager resigns or retires from the position or if any of the requirements for the approval of their appointment are no longer met, the distribution network operator must notify the authorities of this immediately.
Legal basis: 2005 Vienna Electricity Act (German)
Means of redress or appeal
An appeal is possible against rulings issued by an authority and shall be filed by the party within a 4 weeks term with the authority that issued the ruling of first instance (against rulings without investigation procedure within a two weeks term). The term starts with the receipt of the written copy of the ruling, in the case of oral pronouncement simultaneously with it.
The appeal shall indicate the ruling it contests, the authority that issued the ruling and contain a motion of appeal with the reasons. No more appeal is admissible if the party expressly waived the right of appeal after receipt or pronouncement of the ruling.
Each ruling contains instructions on the right to appeal and indicates the authority and the deadline for submission of such appeal.
Assistance and problem-solving services
Point of single contact Vienna
Responsible for the content
Last update
25. September 2024
Feedback to the European Commission:
- SDG Feedback: Information services survey
- SDG Obstacles: Feedback on Single Market Obstacles
City of Vienna | Construction, Energy, Railway and Aviation Law
Contact form